The General Electricity Company of Libya (GECOL) has announced that its technical teams had installed and operated two power distribution substations with a capacity of 500 KV as part of the company’s efforts to stabilize the public grid.
“The first substation was installed on the eastern line 30 Al-Saadia, and the second one on the camp line 30 Al-Sadia in the North Aziziyah Distribution Department,” the GECOL stated on its official Facebook page.