GECOL installs and operates two power distribution substations in Aziziyah region.

0
1700

The General Electricity Company of Libya (GECOL) has announced that its technical teams had installed and operated two power distribution substations with a capacity of 500 KV as part of the company’s efforts to stabilize the public grid.

“The first substation was installed on the eastern line 30 Al-Saadia, and the second one on the camp line 30 Al-Sadia in the North Aziziyah Distribution Department,” the GECOL stated on its official Facebook page.

SOURCElibyaobserver
Previous articleLibya, Pakistan discuss cooperation in labour field.
Next articleLibya and Egypt hold discussions to promote trade exchange.