In Tripoli today was signed between the Libyan European hospital and the main contractor for the completion of the buildings of the hospital.
The contract is worth $16,000,000 and the completion period will be 15 months.
Upon completion the hospital will be the leading healthcare provider in the country with the highest standards in both medical equipment and expertise.
في غرة شهر رجب المبارك وقع المدير التنفيذي انور محمد موسي عقد استكمال مباني المستشفى الليبي الاوروبي مع المقاول الرئيسى قيمة العقد 16 مليون دولار و مدة التنفيذ 15 شهرا